IRINA closeout taskset plan — verification round, and an honest CONCLUSIVE/NOT-CONCLUSIVE split
Date: 2026-09-25 Status: closed Supersedes: none Superseded-by: none — current
Context
Section titled “Context”Closes the 6-taskset plan run this session (2026-09-25, taskset-gating
workflow, stratt-taskset-gating skill) against the question “what are the
next key tasksets that conclusively assert the full IRINA automation
throughput/end-to-end closeout.” Per MR-10, a verification round is
mandatory before any phase-shaped work is declared closed. This doc is
that round — it does not declare blanket closeout, because the evidence
doesn’t support one.
Verification round
Section titled “Verification round”CONCLUSIVELY proven (verified, not inferred):
- Cross-runner WIP-cap lock exclusion against real
irina-cycle.ymldispatches —docs/decisions/2026-09-23-ir-012-burn-in-against-real-dispatches.md§ Result. Two genuinely overlapping runs (35873615815,35873620028, confirmed 2s-apartin_progressvia the Actions API, not assumed from dispatch timing), one refused by name (WIP_CAP_LOCK_HELD: ... held by 35873620028:2271), the other opened exactly one PR (devarno-cloud/hermes#94). No double-open. This is IRINA’s core mechanical throughput guarantee and it holds. docs-invariants.ymlruns and enforces on petrova-codes itself — confirmed live viagh run list, green on every push/PR this session (taskset 3, no-op because already true).- Deep-probe clock unstuck, staleness now surfaced loudly — 16/44
slugs re-probed 2026-09-25 (0 failed),
check-probe-staleness.mjswired intostate-sweep.yml’s existing 30-min cadence (taskset 2). - Full 44-row registry-vs-contract state is current, not an 18%
sample — 25/44 present, 2 gaps closed since 2026-09-22
(
tektree-io,sparki-tools), 1 regression caught (so1-io,docs/findings/20260925-0844-so1-io-contract-regression.md) (taskset 4). - META-RULES corpus drift closed — vendored
core/templates/copy now matches eva-hq canonical v1.3 exactly, not v1.2 (petrova-codes/templates#7, pointer bumped tof16555e, taskset 1 Q2).
NOT conclusive — real, open, each with its own filed artefact (not silently dropped):
- Mímir Q1 (governance-of-governance identity) is still open. The
2026-09-25 arno-host ruling (
docs/decisions/2026-09-25-arno-host-final-interfacing-governance-layer.md) resolved a different axis (human-facing interface layer) and explicitly does not touch2026-09-22-mimir-reconciliation-scoping.md’s Q1-Q4. Those remain unresolved.docs/audit/state.md’s own “knot” — no source of truth for who governs the fleet — is therefore still the knot. - 3 high-priority contract gaps unresolved: skyflow-hq, templates,
abacus — all
strict/production-tier, all still absent per the 2026-09-25 re-run (taskset 4). Findings on file, none closed. - so1-io contract regression, uninvestigated as to cause
(
docs/findings/20260925-0844-so1-io-contract-regression.md) — filed, not yet triaged with the repo owner. - RALPH branch→PR governance was never applicable — the premise
(a console-layer PR-opening path exists and lacks WIP-cap awareness)
doesn’t hold; no such code exists anywhere in rocky-hq
(
docs/findings/20260925-0900-ralph-pr-path-does-not-exist.md). This is not a governance gap to close — it’s a feature that was never built, and building it is rocky-hq’s roadmap call, not an IRINA closeout item. - Three decision docs from this session sit
Status: open, countersign unticked:2026-09-25-arno-host-final-interfacing-governance-layer.md, and (pre-existing, re-surfaced by this round)2026-09-23-ir-012-burn-in-against-real-dispatches.mdand2026-09-22-mimir-reconciliation-scoping.mdstaysclosed(its own status) but the questions it scoped remain unanswered. Perdocs/decisions/2026-08-10-countersign-gates-closed-status.md, an agent never ticks these — they need you.
Decision
Section titled “Decision”Verdict: PARTIAL, not full, closeout. The mechanical claim — “IRINA’s
cross-runner concurrency guarantee holds against real dispatches” — is
CONCLUSIVELY asserted by item 1 above and needs no further work. The
broader claim this session opened with — “full IRINA automation
throughput/end-to-end closeout” at the org-governance level — is NOT
conclusive: the org still has no ratified source of truth for who governs
the fleet (Mímir Q1), and 3 strict-tier repos still lack contracts.
Declaring blanket closeout here would repeat the exact failure mode
docs/decisions/2026-09-05-ratified-status-mapped-to-closed.md and this
session’s own MR-9 discipline (Taskset 1) were invoked to avoid.
What would make it conclusive
Section titled “What would make it conclusive”- Mímir Q1 ruled (human decision,
2026-09-22-mimir-reconciliation-scoping.md). - The 3 high-priority contract gaps closed (skyflow-hq, templates, abacus).
- This doc, the arno-host doc, and IR-012’s burn-in doc all countersigned.
None of these are blocked on more agent work — they’re blocked on rulings and contract-authoring that need a human or the consumer-repo owners.
Consequences
Section titled “Consequences”For code: none — this is a verification-round doc.
For docs: none superseded. Surfaces three open countersigns in one place rather than leaving them scattered across the session.
For in-flight phases: none in petrova-codes.
For invariants: MR-10 (verification round mandatory at close) is what this doc discharges. MR-9 (no invented invariants) is why it doesn’t round up to “done.”
References
Section titled “References”- docs/decisions/2026-09-23-ir-012-burn-in-against-real-dispatches.md
- docs/decisions/2026-09-25-arno-host-final-interfacing-governance-layer.md
- docs/decisions/2026-09-22-mimir-reconciliation-scoping.md
- docs/audit/contract-sweep-2026-09-22.md
- docs/findings/20260925-0844-so1-io-contract-regression.md
- docs/findings/20260925-0900-ralph-pr-path-does-not-exist.md
- docs/audit/state.md
Update — 2026-09-25 (post-approval, contract gaps closed)
Section titled “Update — 2026-09-25 (post-approval, contract gaps closed)”Item 2 of “what would make it conclusive” is done: all 3 strict-tier PRs
(petrova-codes/templates#8, devarno-cloud/abacus#49,
skyflow-blue/skyflow-hq#154) confirmed MERGED via gh pr view. Fresh
44-row sweep (docs/audit/contract-sweep-2026-09-25.md,
node scripts/registry-contract-sweep.mjs) confirms all three now read
present via gh api (not local, so not subject to the so1-io
directory-mislabeling bug). Count: 27/44 present (up from 25/44).
so1-io still reads present via local method in this same sweep —
this is the same mislabeled-directory false-positive documented in
docs/findings/20260925-0844-so1-io-contract-regression.md, not a new
or reopened gap; so1-io/veritas (the registered repo) has confirmed
zero contract via gh api 404. Not re-litigated here.
Remaining from the “what would make it conclusive” list: item 1 (Mímir Q1 ruling) and item 3 (3 countersigns) are both human-only actions, not agent-actionable. No further agent tasksets change this doc’s verdict — still PARTIAL pending those two.
Update — 2026-09-25 (all 5 countersigns ticked, verdict flips)
Section titled “Update — 2026-09-25 (all 5 countersigns ticked, verdict flips)”All 5 open countersigns ticked by alex@devarno.com in this session:
2026-09-23-ir-012-burn-in-against-real-dispatches.md,
2026-09-25-arno-host-final-interfacing-governance-layer.md,
2026-09-25-integrations-console-panto-cloud-not-applicable.md,
2026-09-25-mimir-retired-not-ratified.md, and this doc itself. Each
Status: flipped open → closed to match, per this repo’s own gate
(2026-08-10-countersign-gates-closed-status.md).
All three items on the “what would make it conclusive” list are now satisfied: (1) Mímir Q1 ruled — retired, countersigned; (2) 3 strict-tier contract gaps closed and merged (previous update, this doc); (3) all 3 named countersigns plus this doc’s own are ticked.
Verdict: CONCLUSIVE. Full IRINA automation throughput/end-to-end closeout — mechanical guarantee (IR-012 cross-runner WIP-cap lock) and org-governance layer (Mímir retirement, arno-host interfacing ratification, contract coverage) are both now asserted, not partial.
Sign-off
Section titled “Sign-off”- Subagent: claude-sonnet-5 (session_01488gmoyur1UAMfpNMgUAhC)
- Human: alex@devarno.com — confirms this verification round’s CONCLUSIVE/NOT-conclusive split is accurate and that the “what would make it conclusive” list is the right remaining scope (not more agent tasksets).
- Countersigned by
human:alex@devarno.comon 2026-09-25.