title: Defer Traceo wiring for optional repos (eva-hq, skyflow-hq) date: 2026-05-20 status: ratified mr_compliance: [MR-7, MR-13] ranks_under: docs/decisions/2026-05-01-traceo-wire-adoption.md
Section titled “title: Defer Traceo wiring for optional repos (eva-hq, skyflow-hq) date: 2026-05-20 status: ratified mr_compliance: [MR-7, MR-13] ranks_under: docs/decisions/2026-05-01-traceo-wire-adoption.md”Context
Section titled “Context”Sub-project C ratified integrations_applicability.traceo: required for 5
repos and optional for 2 (eva-hq, skyflow-hq). The
petrova-wire-traceo execution sub-project does not pursue the optional
wirings in this cycle because:
eva-hqis pre-launch: the eva consumption surface itself is not yet published (see2026-05-06-rocky-ownership-and-eva-introduction.md).skyflow-hqhas nostate/skyflow-hq.yamland is not currently governed by the integration spine; introducing Traceo would require an onboarding pass first.
The state schema’s current_status enum has no deferred_optional
value. Per the kahn-hq crumb precedent (registry.yaml notes on
crumb: not_applicable with review_by 2026-08-01), we model
“optional + not pursued this cycle” as current_status: not_applicable
with a review_by clause recorded in the registry notes and the state
probe_history detail.
Decision
Section titled “Decision”eva-hq: flipstate/eva-hq.yaml.current_status.traceofrompendingtonot_applicable. Append a registry note recordingtraceo.review_by: 2026-08-20.skyflow-hq: no state file change (it has no state file). Append a registry note recordingtraceo.review_by: 2026-08-20.- Revisit on 2026-08-20: if the eva surface has launched OR skyflow-hq has been onboarded, re-evaluate applicability and open a wiring decision.
Consequences
Section titled “Consequences”petrova doctorreportstraceo: not_applicablefor both repos rather thanpending— no false-negative noise on the dashboard.- The
optionalapplicability declaration in registry is unchanged (governance intent is preserved per the ARES sub-project B rollback precedent — applicability declarations are never silently downgraded). - This decision creates a calendar dependency: an explicit review on 2026-08-20.
Schema follow-up (not blocking)
Section titled “Schema follow-up (not blocking)”Open question for future sub-project: introduce a
current_status: deferred_optional enum value so the “optional, not
pursued” state is distinguishable from genuine not_applicable. Out
of scope here; tracked as a finding.