2026-05-15 — Edit registry for choco-hq
rank: decision outranks: []
Section titled “rank: decision outranks: []”2026-05-15 — Edit registry for choco-hq
Section titled “2026-05-15 — Edit registry for choco-hq”Date: 2026-05-15 Status: ratified Verb: petrova_act_registry_edit Slug: choco-hq MR-compliance: MR-4, MR-7, MR-12
Rationale
Section titled “Rationale”Ratified by choco-hq decision 0011 (docs/decisions/2026-05-15-integrations-ares-traceo-rocky-not-applicable.md): no ARES emission surface, TRACEO federation responder, or ROCKY (LORE+CAIRNET) emission exists for choco-hq. TRACEO end-to-end belongs to Spec 2 (Golden Round-Trip clause 2), gated separately. All three get review_by 2026-08-15, mirroring the crumb/eva not_applicable pattern established at contract bootstrap.
Change summary
Section titled “Change summary”registry.yaml > repos[choco-hq] after this verb:
- slug: choco-hq url: https://github.com/choco-hq/choco-hq default_branch: main role: experimental profile: standard fleets_allowed: [] added: '2026-04-29' contract_sha: c9768b7f5ca5 integrations_applicability: ares: not_applicable traceo: not_applicable crumb: not_applicable rocky: not_applicable eva: not_applicable contract_committers: - humans notes: | Choco platform planning + coordination hub (~24 services, ~31 repos). PETROVA control-loop adopted under docs/decisions/0001-adopt-petrova-control-loop.md (2026-04-29). AGENTS.xml at repo root declares 9 verbs (diagnose, open_decision, update_milestone, start_phase, close_phase, verify_round, request_review, request_merge_when_green, propose_fix) and gates requirements/, contracts/, proto/, infrastructure/, architecture/, docs/north-star/, docs/decisions/ as review-gated surfaces. CLAUDE.md is a strict MR-12 projection of docs/north-star/intent.md + MILESTONES.md. First verify_round closed-with-deferrals at docs/findings/2026-04-29-petrova-bootstrap-verify-round.md; phase open under docs/decisions/0002-start-phase-petrova-bootstrap-closeout.md pending the merge of THIS PR. role=experimental until first end-to-end TASKSET / Block close (see AGENTS.xml <promotion-gate>); fleets_allowed empty by design — promotion is itself a decision. crumb applicability set to not_applicable on 2026-05-01 with review_by 2026-08-01 — no CRUMB cards exist for this slug yet (sub-project D).Envelope
Section titled “Envelope”idempotency_key: b322d8a1e0b225d4a88b245e5e417b94ee6399eb56c3aa5963ba88429866a9ceschema_fingerprint: 527e83bf1a3bactor: human:ops@devarno.cloudtriggered_by: kind: human_request ref: cliapplied_at_iso: '2026-05-15T20:02:49.585Z'Sign-off
Section titled “Sign-off”Human merge required per MR-12 — this PR is opened with the
awaiting-human-merge label and does not auto-merge.