Skip to content

2026-05-12-ares-phase1-gate-review


title: ARES Phase 1 Gate Review — Waves 1 + 2 date: 2026-05-12 status: ratified mr_compliance: [MR-1, MR-7]

Section titled “title: ARES Phase 1 Gate Review — Waves 1 + 2 date: 2026-05-12 status: ratified mr_compliance: [MR-1, MR-7]”

Per docs/runbooks/ares-wire-rollout.md, waves 1 (traceo-mcp-server) and 2 (grace-hq) were wired serially on 2026-05-12. The gate review runs after wave 2 completes before Phase 2 pipelining begins.

  • Missing rollback path? No. gh api -X DELETE /orgs/<org>/hooks/<id> is documented in docs/runbooks/ares-wire-rollout.md §“Rollback (whole programme)” and cited in each consumer repo’s deployment doc path.
  • Unsafe sandbox interaction? No. Webhook secret was retrieved from Railway and piped directly into gh api -f "config[secret]=..." without ever being echoed or committed.
  • Hard-coded value needing placeholder? No. The ingest endpoint (cicd.devarno.cloud) and webhook event (workflow_run) are stable deployment facts, not environment-specific placeholders.
  • Procedural surprises requiring prompt update? No. The procedure ran as documented.
WaveRepoOrg webhook IDScopeContract status
1traceo-mcp-server622165750org (traceo-ai)wired
2grace-hq622165757org (grace-hq)wired

Pass. No fixes to core/prompts/06-ares-wire.md required. Proceed to Phase 2.

Phase 2 waves (3a choco-hq, 3b stratt-hq, 3c devarno-cloud, 3d kahn-hq) may now be pipelined per the runbook’s pipelining rule.